14October 2026
ASX ANNOUNCEMENT
2026 Market Update – FY26 Results and Future Priorities
Locality Planning Energy Holdings Limited (ASX: LPE) (“LPE” or “the Company”) announces that a recording
of its October 2026 investor briefing is now available on InvestorHub.
The briefing features:
- Craig Chambers, Chair;
- James Harvey, Group Executive, Development and Sales; and
- Sandra Pienaar, Chief Financial Officer.
The presenters discuss LPE’s FY26 financial results, key achievements during the year and strategic
priorities for FY27. The briefing also includes responses to questions submitted by investors through
InvestorHub.
Shareholders and investors can access the recording using the link below:
Investor Webinar October 2026: FY2026 results and FY2027 priorities
Authorised for release.
Craig Chambers
Chair
investors@localityenergy.com.au
ENDS
__________________
Locality Planning Energy Holdings Ltd (ASX: LPE) 1300 443 735 | localityenergy.com.au
ABN 90 147 867 301 PO Box 5737 Maroochydore BC QLD 4558
Page 2 of 2
About LPE
Locality Planning Energy Holdings Limited (ASX: LPE) is an Australian provider of embedded network
and multi-utility infrastructure and services, operating across Australia.
LPE funds, installs and operates infrastructure that delivers electricity, water, hot water, solar, battery
storage, electric vehicle charging and smart metering solutions. Its business model combines
infrastructure investment with long-term service agreements that support recurring revenue.
The Company partners with developers, property owners and community operators to deliver
integrated utility solutions across strata properties, land lease communities and retail shopping
centres. These partnerships support LPE’s growth while helping communities improve energy
efficiency and manage utility costs.
How to contact us
If you have any questions on this announcement or any past LPE announcements, visit our Investor
Hub. Like, comment or ask a question on our announcements. You can find this through the following
link or by scanning the QR code:
investorhub.localityenergy.com.au
Web
http://www.localityenergy.com.au
Enquiries
1300 443 735
Monday to Friday
8:30am to 5:00pm
Email
investors@localityenergy.com.au
Postal address
PO Box 5737
Maroochydore BC QLD 45
1
Empowering your Everyday
Locality Planning Energy Holdings Limited (ASX: LPE)
Market Update
FY2026 Results Presentation and Business Update
For the year ended 30 June 2026
October 2026
2
Empowering your Everyday
IMPORTANT INFORMATION
Disclaimer and important information
General disclaimer
This presentation has been prepared by Locality Planning Energy Holdings Limited (LPE) for information purposes
only. It is a summary and does not purport to contain all information a prospective investor may require. It is not
financial product, investment, legal, taxation or accounting advice, and does not take into account the
investment objectives, financial situation or needs of any person. Recipients should make their own independent
assessment and obtain their own professional advice. Nothing in it constitutes an offer, invitation or
recommendation to subscribe for, buy or sell any security.
Information basis and liability
This presentation is based on information available to LPE at the date of preparation. To the maximum extent
permitted by law, no representation or warranty, express or implied, is given as to the accuracy, completeness or
reasonableness of the information or of any estimate, forecast or projection, and LPE and its officers, advisers,
agents and employees disclaim all liability (including for negligence) for any loss arising from the use of, or
reliance on, this presentation.
Forward-looking statements
This presentation contains forward-looking statements, including about the activation of pipeline service points
and the integration and expected contribution of the PowerHub acquisition. These statements are not
guarantees of future performance. They are based on assumptions current at the date of this presentation and
are subject to risks and uncertainties, many outside LPE's control, including the rate of pipeline site activation,
counterparty performance, and market and regulatory conditions. Actual outcomes may differ materially. Except
as required by law or the ASX Listing Rules, LPE does not undertake to update any forward-looking statement.
Non-IFRS information
Core earnings is a non-IFRS measure that has not been audited or reviewed under Australian Auditing Standards.
It is defined, and reconciled to statutory net profit after income tax, in the FY2026 Annual Report. Non-IFRS
measures should not be considered in isolation or as a substitute for IFRS measures, and may not be comparable
to those of other companies.
Past performance
Past performance, including historical and pro forma financial information, is illustrative only and is not, and
should not be relied upon as, an indication or guarantee of future performance.
Investment risk
An investment in LPE is subject to risks, both specific to LPE and general to listed securities, that may affect its
financial performance and share price. Investors should consider these risks and obtain their own advice before
making any investment decision.
Third-party information
Market, industry and economic data attributed to third parties has not been independently verified by LPE, which
makes no representation as to its accuracy or completeness.
Rounding and currency
Figures are subject to rounding, so totals may not sum exactly. Amounts are in Australian dollars unless otherwise
stated.
Authorisation
Read with the FY2026 Annual Report and Appendix 4E, released 28 August 2026, and LPE's other ASX
announcements. Authorised for release by the Board.
3
Empowering your Everyday
INTRODUCTION
Welcome
ACKNOWLEDGEMENT OF COUNTRY
LPE acknowledges Traditional Owners of Country throughout Australia and
recognises the continuing connection to lands, waters and communities.
We pay our respect to Aboriginal and Torres Strait Islander cultures, and to Elders
past and present.
PRESENTING TODAY
Craig Chambers
Chair
Sandra Pienaar
Chief Financial Officer
James Harvey
Group Executive, Development and Sales
The Board has established an interim Office of the CEO, reporting to the Chair, while a search for a
permanent Chief Executive Officer is under way.
4
Empowering your Everyday
AGENDA
What we will cover
1.0 Business Performance
2.0 Operational Update
3.0 LPE Growth Drivers
4.0 FY2027 and Beyond
5
Empowering your Everyday
1.0
Business Performance
Who LPE is, what it operates, and how FY2026 finished.
6
Empowering your Everyday
BUSINESS PERFORMANCE
An integrated multi-utility provider, back in statutory profit in FY2026
LPE serves developers, asset owners and communities across Queensland and Northern New South Wales, with a
growing presence in South Australia and Tasmania and a first community contracted in Victoria.
37,501
Active service points
402
Sites: 377 operating
plus 25 contracted
25.0%
Gross profit margin
$2.31M
Statutory net profit
▲ from a $3.49M loss
$1.62M
Core earnings
▲ up 20%
0.5%
Debt to total assets
▼ from 10.4%
▲ from 24.8%
▲ 39,883 incl. 2,382 contracted
WHERE WE OPERATE
South East Queensland
Regional Queensland
Northern New South Wales
South Australia
Tasmania
Victoria
Principal operating region
Also operating
377 operating sites and 37,501 active service points at 30 June 2026, across Queensland and
Northern New South Wales. PowerHub, completed 13 August 2026, extends the footprint into South
Australia and Tasmania, and LPE's first Victorian community was contracted on 2 October 2026.
Service point counts are measured on the FY2026 basis. Locations indicate presence, not scale.
Source: FY2026 Annual Report and results announcement, 28 August 2026; ASX announcement, 2 October 2026. Core earnings is a non-IFRS measure, reconciled in the FY2026 Annual Report.
AUDIT
OUTCOME
Unmodified opinion for FY2026, no material uncertainty on going concern, and no material
control or disclosure deficiencies reported.
First community contracted
7
Empowering your Everyday
BUSINESS PERFORMANCE
We manage, own and operate the utility infrastructure inside communities
Embedded electricity networks
The network inside the community, metered, billed and
maintained by LPE.
Hot and cold water
Centralised hot water plant and water metering across
residential communities.
Rooftop solar
Solar generation owned by LPE behind the community
connection point, supplying residents at lower cost.
Community batteries
Shared storage that holds surplus solar and dispatches it
back to the community when demand and prices peak.
Electric vehicle charging
Shared and private charging built into new communities
as they are developed.
Metering and billing
The billing platform and customer service across every
service point.
HOW IT FITS TOGETHER
From early strategy and construction through to long-term operations, LPE
works to make every system perform together across multiple asset classes.
LPE earns from operating embedded networks, and separately from the utility infrastructure it chooses to fund and own.
8
Empowering your Everyday
BUSINESS PERFORMANCE
Profit and earnings up, costs down
$M FY2025 FY2026 Movement
Revenue $41.64M $41.13M ▼ 1.2%
Gross profit $10.34M $10.30M ▼ 0.4%
Gross profit margin 24.8% 25.0% ▲ 0.2 points
Other income, including interest $3.19M $2.64M ▼ 17.2%
Total operating profit $13.52M $12.94M ▼ 4.3%
Operating costs excluding impairment ($9.41M) ($9.07M) ▼ 3.6%
Statutory net (loss) profit ($3.49M) $2.31M ▲ 166%
Core earnings $1.35M $1.62M ▲ 20%
WHY
Lower consumer consumption: Energy volumes across the
portfolio were below the prior year, which explains the
revenue movement.
Margin held and improved: Gross margin rose to 25.0%
from 24.8%.
Procurement locked in: LPE progressively buys energy under
3-year contracts, secured on competitive terms, which holds
the energy cost base steady for the contract term.
Cost management: LPE focused on retaining profitable sites
and managing its cost base.
Source: FY2026 results announcement and Annual Report, 28 August 2026. Operating costs excluding impairment is non-IFRS; statutory net profit is after impairment of $1.56M (FY2025: $7.60M, Note 5e). Green is favourable, red unfavourable.
▲ Net profit up 166% to $2.31M ▲ Core earnings up 20% ▼ Costs excluding impairment down 3.6%
9
Empowering your Everyday
BUSINESS PERFORMANCE
Gross profit held at $10.3M as revenue eased and margin rose to 25.0%
Revenue to gross profit, FY2026, $M
WHY GROSS PROFIT IS THE MEASURE
• The base for growth: each new service
point adds to the $10.3M of gross profit,
not just to revenue.
• Revenue tracks prices and volumes: LPE
buys energy at bulk rates and sells it at a
margin, so revenue moves with energy
prices and consumption.
• Margin held: gross profit fell 0.4% against
a 1.2% fall in revenue, lifting margin to
25.0% from 24.8%.
Cost of sales is revenue less gross profit. Gross profit excludes unrealised derivative gains and losses. Source: FY2026 Annual Report and results announcement, 28 August 2026.
$41.13M −$30.83M
$10.30M
Revenue Cost of sales Gross profit
10
Empowering your Everyday
BUSINESS PERFORMANCE
Revenue stabilised, margin held and core earnings have improved
* Core earnings is a non-IFRS measure and has not been audited or reviewed: statutory net profit after tax adjusted for items the Board does not expect to recur. Reconciliation in the FY2026 Annual Report. Gross margin excludes unrealised derivative gains and
losses.
Revenue
$M
Revenue is stable. It has held between $40.5M and $41.6M
for 3 years, moving with energy prices and consumption
because LPE buys energy at bulk rates and sells it at a
margin.
Gross margin
% of revenue, excluding unrealised derivatives
Margin held. It has averaged 25.3% over the last 3 years. As
more communities add LPE-owned infrastructure, fixed
daily charges are expected to make a growing share of cash
and income independent of consumption.
Core earnings
$M, non-IFRS, reported on this basis from FY2024*
Earnings grew on a stable base. Core earnings rose 20%,
from $1.35M to $1.62M, and LPE returned to statutory
profit on the same revenue base.
$40.5M $41.6M $41.1M
FY2024 FY2025 FY2026
26.0%
24.8%
25.0%
0%
10%
20%
30%
FY2024 FY2025 FY2026
$1.35M
$1.62M
FY2025 FY2026
+20%
11
Empowering your Everyday
BUSINESS PERFORMANCE
Deleveraging took borrowings from $3.94M to $0.10M in 2 years
Balance sheet at 30 June FY2025 FY2026
Borrowings $2.22M $0.10M
Debt to total assets 10.4% 0.5%
Net tangible assets $6.76M $9.32M
Net tangible assets per share 3.73c 5.11c
Total equity $7.34M $9.75M
Cash available $4.45M $4.79M
Cost of senior debt
Almost halved
on the $7.2M Westpac facility executed
7 August 2026, after balance date
Borrowings are current plus non-current at 30 June. FY2024 and FY2025 as published. Source: FY2026 Annual Report and results announcement.
BORROWINGS, $M, AT 30 JUNE
LPE enters its growth phase with the capacity to borrow, which is the point of having spent 2 years not borrowing.
Debt to total assets: 17.5%, 10.4%, 0.5% (FY2024 to FY2026)
$3.94M
$2.22M
$0.10M
FY2024 FY2025 FY2026
-97.4%
12
Empowering your Everyday
BUSINESS PERFORMANCE
Service, cash receipts and engagement all improved through FY2026
39
Net Promoter Score
▲ up 28 points, Verian survey of 1,735 customers
51
Days sales outstanding
6 days or 11% improvement
74%
Employee engagement
▲ from 59%
THE OPERATING BASE
Agreements
175 infrastructure agreements in place at 30 June 2026.
Renewals repriced against LPE's return thresholds.
Energy procurement
Progressive 3-year wholesale supply contracts secured on competitive terms.
Credit and collections
Bad debt within budget; days sales outstanding improved.
Contracted pipeline
Activation follows developer construction timing; contracted sites not yet live carry into
FY2027.
Service quality, billing discipline and engagement all moved the same way in FY2026, and they form the operating base the growth pipeline lands on.
Source: FY2026 Annual Report and results announcement, 28 August 2026. Net Promoter Score measured by Verian.
13
Empowering your Everyday
2.0
Operational update
What LPE has signed, what it costs to build, and how fast it converts.
14
Empowering your Everyday
OPERATIONAL UPDATE
Two income streams: embedded network sales, and a return on infrastructure
LPE operates embedded networks, earning a margin on the energy and water it sells to residents.
Where LPE also funds and owns the utility infrastructure inside a community, it earns a return on that capital as well.
The two streams are independent: some communities are network sales only, some are infrastructure only, and many are both.
1
SIGN
LPE signs a long-dated
agreement with the
developer or asset owner.
›
2
BUILD
LPE funds and installs the
network, metering, hot
water, solar and charging in
stages as the community is
built, so not all capital is
needed upfront.
›
3
ACTIVATE
Service points go live as
homes are completed and
occupied. Timing follows the
developer's programme.
›
4
EARN
Network sales earn a margin
on energy and water for the
life of the agreement.
Owned infrastructure earns
a fixed daily charge that
returns the capital invested.
›
5
RENEW
At expiry, the agreement is
renewed, repriced against
LPE's return thresholds, or
released.
Capital is staged with the build, not all upfront The asset is the network, not the customer
Revenue is contracted, recurring and long-dated Growth is visible before it is earned
15
Empowering your Everyday
OPERATIONAL UPDATE
Growth comes from three engines: renewals, acquisitions and new build
Growth comes from three places, and they carry different capital, different risk and different timing.
RENEWALS
Retaining and repricing network sales and, where LPE
owns the infrastructure, the infrastructure charge, as
agreements expire.
37,501
active service points to defend and reprice
• Renewals are a recurring and material workstream rather
than an event.
• LPE's return thresholds govern every renewal, and service
points that did not meet them were released from the
portfolio during FY2026.
ACQUISITIONS (BROWNFIELD)
Acquiring operators and networks that already exist
and already earn.
4,667
service points acquired since end of financial year
• PowerHub completed 13 August 2026: 4,642 service points,
extending LPE into South Australia and Tasmania.
• $2.8M paid at completion from existing reserves, with up to
$3.0M contingent on pipeline execution and site activation.
• New service points activate onto the platform LPE already
operates, for example 25 service points at LPE's first retail
shopping centre, Parkhurst Town Centre.
NEW BUILD (GREENFIELD)
Contracting new communities as network operator,
infrastructure owner, or both.
5,422
service points contracted through strategic partnerships
• 27 agreements of 10 years across 20 sites became
operational in FY2026.
• The partnerships announced 15 July 2026 cover 18 sites,
more than 3,000 new homes and an estimated $5.8M of
capital investment.
• The partnerships announced 2 October 2026 cover 3 sites,
747 service points, expansion into Victoria and an estimated
$1.3M of capital investment.
16
Empowering your Everyday
OPERATIONAL UPDATE
39,883 service points at 30 June 2026; up to 10,089 more announced since
SERVICE POINTS, FIRM AND ANNOUNCED PIPELINE FIRM AT 30 JUNE 2026
39,883 service points
37,501 active plus 2,382 contracted
402 sites
377 operating plus 25 contracted
ANNOUNCED SINCE YEAR END
up to 10,089 service points
PowerHub: 4,642 at acquisition
Partnerships: 5,447 across 21 sites
Range: 39,883 firm, rising to 49,972 if every announced
service point is delivered. Only the 37,501 active earned
in FY2026.
The figures describe a pipeline, not a forecast. The pools are measured on different bases and dates: PowerHub counts are as announced and being realigned to LPE's definitions; partnership figures are the developer's estimate at completion; master services points
are counted only as service orders are issued. Delivery is staged with each developer's construction programme, and LPE cannot reliably estimate its timing. Definitions in the FY2026 Annual Report. Source: FY2026 Annual Report; ASX announcements 15 July, 13
August and 2 October 2026.
37,501
+2,382
+4,642
+5,447 49,972
Active Contracted PowerHub Partnerships Potential
17
Empowering your Everyday
OPERATIONAL UPDATE
Agreements are twice as long and 2.6x larger than the existing portfolio
27 infrastructure agreements of 10yrs, across 20 sites, became operational in FY2026.
Cohort figures are as announced; service points at completion are the developer's estimate. Existing portfolio figures are FY2025 averages, and its agreement life is approximate. Source: ASX announcements 15 July and 2 October 2026; FY2026 Annual Report.
LPE has not published a return on infrastructure capital and the WALE listed above refers only to the 175 sites under infrastructure works agreements (IWA) at 30 June 2026
Longer agreements and larger communities lengthen both income streams and, where LPE owns the infrastructure, the capital earns for longer before it is re-priced.
TARGETED AGREEMENT LIFE, YEARS SERVICE POINTS PER COMMUNITY, AVE
about 5 yrs
10 yrs
Traditional portfolio Signed FY2026
2.0x
99
261
Existing portfolio Signed FY2026
2.6x
4.9yrs weighted average remaining agreement term (WALE) at 30 June 2026
18
Empowering your Everyday
OPERATIONAL UPDATE
PowerHub: 4,642 service points, half paid only on activation
Timing and funding: completed 13 August 2026, funded from existing reserves with no shares issued or dilution.
Service point counts are as announced and are being realigned to LPE's service point definitions; site counts are not presented. Contingent share is $3.0M of $5.8M. Source: ASX announcement 13 August 2026.
SERVICE POINTS ACQUIRED, BY STATUS AT COMPLETION CONSIDERATION, $M
52%
of the up to $5.8M consideration is
contingent, payable only as the 2,758
pipeline service points are activated
within 5 years.
$2.8M
paid at completion from existing
reserves, for the 1,697 service points
already billing, as well as the 187
contracted service points.
2,945
1,697
Not yet active: 187 contracted,
2,758 pipeline
Active, billing from day one
$3.0M
$2.8M
Contingent on
activation
At completion,
from cash reserves
19
Empowering your Everyday
OPERATIONAL UPDATE
Four announcements since 30 June show the strategy being executed
15 July 2026 7 August 2026 13 August 2026 2 October 2026
Three strategic
development partnerships
• 18 sites and about 4,700 service
points at completion
• Affordable housing, townhouses
and land lease
• Shift from energy on-selling to
infrastructure investment
$7.2M Westpac facility
• Cost of senior debt almost
halved
• Longer tenor and a single lender
• Funds the contracted growth
pipeline
PowerHub acquisition
• 4,642 service points, into South
Australia and Tasmania
• $2.8M paid from reserves, no
shares issued
• Balance payable only as the
pipeline activates
Three new long-term
agreements
• First Victorian community, on a
15-year term
• First shopping centre, with LPE's
largest solar system to date
• Further land lease growth in
regional Queensland
20
Empowering your Everyday
3.0
LPE GROWTH DRIVERS
Renewals, acquisitions and greenfield, onto one operating platform.
21
Empowering your Everyday
LPE GROWTH DRIVERS
Every LPE state is adding people, and national housing supply is rising
Every new resident and approved dwelling is a potential service point; the shift to apartments and master-planned estates lands directly in LPE’s target markets.
Population: ABS, National, state and territory population, March 2026, released 17 September 2026. Dwelling approvals: ABS, Building Approvals, Australia, August 2026, trend estimate; apartments for 2025-26 from the June 2026 release. Homes under construction and Accord completions: National
Housing Supply and Affordability Council, Quarterly Report, August 2026. Third-party information has not been independently verified by LPE and is not a forecast of LPE's growth.
Population growth by state
persons added, year to 31 March 2026 (annual growth rate in brackets)
LPE footprint: QLD and NSW operating; South Australia and Tasmania entered with PowerHub, 13 August 2026; Victoria entered
with the first contracted community, 2 October 2026. Western Australia is not served.
+392,700
Australians added in the year to 31 March 2026, up 1.4%
Net overseas migration supplied 74% of the growth
18,200
dwellings approved a month nationally, August 2026 trend
▲ 9.1% on a year earlier; 244,000 under construction
48,778
apartments approved nationally in 2025-26
▲ 13.2%, the most since 2017-18
+3,400
+18,400
+64,200
+90,100
+97,000
+109,500
Tasmania (0.6%)
South Australia (1.0%)
Western Australia (2.1%)
Queensland (1.6%)
New South Wales (1.1%)
Victoria (1.6%)
22
Empowering your Everyday
LPE GROWTH DRIVERS
Every new community and acquisition must pass the same four tests
TEST 1
Strategic fit
Does it extend LPE's portfolio in a
market it serves or is entering?
TEST 2
Return
Does it clear the return threshold
once risk is priced in?
TEST 3
Risk
Is the counterparty, contract and
delivery risk one LPE can carry?
TEST 4
Delivery
Can LPE integrate and run it well,
adding people only where
returns support it?
FY2026 PROOF PowerHub
Acquired August 2026: four
communities and 4,642
service points in states LPE
serves or is entering (SA,
Tasmania).
FY2026 PROOF Longer terms
27 infrastructure agreements
of 10 years became
operational, each priced
against the return threshold.
FY2026 PROOF Staged funding
Network capital is released as
homes are built, so LPE
carries delivery risk in steps,
not up front.
FY2026 PROOF One platform
New service points land on
billing, procurement and
service LPE already runs;
people added only where
returns support it.
Capital goes to growth that passes all four tests first; how the surplus is returned is on the next slide.
23
Empowering your Everyday
LPE GROWTH DRIVERS
Capital Allocation: growth funded first, then buy-back, then dividends
DEBT
$7.2M
Westpac facility executed 7 August 2026
• Borrowings reduced from $3.94M to
$0.10M over two years before refinancing
• Cost of senior debt almost halved;
capacity to fund the contracted pipeline
BUY-BACK
On-market
buy-back announced, funded from operating
cash flow
• Funded from operating cash flow and
existing reserves, not growth capital
• Orderly on-market liquidity for
shareholders
DIVIDEND TEST
$45.14M
accumulated losses at 30 June ‘26, down from
$47.55M
• No dividend until accumulated losses are
recovered
• Unrecognised deferred tax asset as at
30 June 2026 of $5.31M
• FY2026 earnings decreased the gap;
contracts since year end shorten it further
Growth capital comes first; the buy-back and, later, dividends are funded from what the operating base earns.
Borrowings are current plus non-current at 30 June. Accumulated losses per the FY2026 Annual Report. Source: FY2026 Annual Report and results announcement, 28 August 2026; ASX announcements 7 August 2026 (Westpac facility) and buy-back announcement.
CAPITAL PRIORITIES, IN ORDER
1 Fund the contracted
infrastructure pipeline
2 Integrate PowerHub
and convert its pipeline
3 Selective acquisitions
that pass all four tests
4 Return capital
through the buy-back
24
Empowering your Everyday
4.0
FY2027 AND BEYOND
Housing growth, regulatory change and the FY2027 priorities.
25
Empowering your Everyday
FY2027 AND BEYOND
Four FY2027 priorities convert FY2026 contracts into recurring revenue
Turn the capital committed and contracts signed in FY2026 into recurring revenue. The four priorities, in order:
01
Serve and earn
Service delivery to customers
while improving core earnings.
02
Grow via partnerships
Maintain momentum on growth
through partners, including land
lease and Build-to-Rent.
03
Integrate and target
Deliver the PowerHub benefits
while testing the market for new
growth opportunities.
04
Build the platform
Invest in a scalable core
technology stack where revenue
outgrows cost.
No numeric guidance for FY2027: the measure of the year is contracted service points becoming active ones.
FY2027 priorities as published in the FY2026 Annual Report and results announcement, 28 August 2026. LPE has given no guidance for FY2027.
26
Empowering your Everyday
FY2027 AND BEYOND
Key takeaways
Profitable
Back in statutory profit at
$2.31M, with core earnings up
20% to $1.62M on a stable
$41M revenue base.
Funded
Borrowings down to $0.10M, a
$7.2M Westpac facility in place
and the cost of senior debt
almost halved.
Contracted
39,883 service points firm at 30
June and up to 10,089 more
announced since, on longer
term agreements and larger
communities.
Converting
FY2027 turns contracted
service points into active ones
as developers deliver homes,
funding the buy-back from
what the base earns.
FY2026 profit came from the active base alone: the 2,382 contracted and up to 10,089 announced service points did not contribute.
27
Empowering your Everyday
Questions
28
Empowering your Everyday
QUESTIONS
Five questions we expect, and who will answer them
Please provide additional questions via Investor Hub.
01 LEADERSHIP Who is leading LPE while the Board searches for a new CEO? Craig
02 BIOHUB LOAN Will any of the BioHub money come back, and what has changed since? Sandra, Craig
03 SCALE AND CONVERSION How big is the business today, and how much of the pipeline turns into earnings? James
04 MARGINS Competition and regulation are both tightening. Can LPE hold its margins? James
05 CAPITAL Why buy back shares instead of funding growth, and when is a dividend coming? Craig
31
Empowering your Everyday
APPENDIX
Board and executive leadership
BOARD
Craig Chambers
Chair
David Jarjoura
Non-executive director
Nicole Noye
Non-executive director
Andrew Vlachos
Non-executive director
EXECUTIVE
Sandra Pienaar
Chief Financial Officer
James Harvey
Group Executive, Development and Sales
Alan Daly
Chief Commercial Officer
The three executives jointly lead the Company as an interim Office of the CEO, reporting to the
Chair, while the Board conducts a search for a permanent Chief Executive Officer.
32
Empowering your Everyday
Thank you
INVESTOR HUB
investorhub.localityenergy.com.au
EMAIL
investors@localityenergy.com.au
WEB
localityenergy.com.au
ENQUIRIES
1300 443 735
Share your feedback
Discover